OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
gsw-1-a9 / gsw-1-n7 (Paris)
Scheduled Maintenance Report for Network & Infrastructure
Completed
We will upgrade those equipment in the latest versions recommended.
The objective on the n77 is to allow the implementation of new features and new hardware support during the coming next year on this equipment. On the ASR9k, the objective is to fix the bug on the NP of the linecards.

Both equipment will be isolated before maintenance, and traffic will flow to other peering points.
The following services will be impacted by this maintenance:
> Housing of Global Switch will be isolated,
> VOiP (Service will be re-routed to the PoP of TH2),
> vRack Connect without redundant link (located at Equinix PA3 and Global Switch Datacenter),
> CDN (Traffic will be re-routed to other CDN infrastructure all over Europe).

We plan to do this maintenance on Wednesday 6th of December at 01:00am (UTC).

Weathermap: http://weathermap.ovh.net/#paris

Update(s):

Date: 2017-12-06 03:21:51 UTC
The linecard from the slot 7 has been upgraded. We are now checking both equipment and we will put back them in production.


Date: 2017-12-06 02:56:05 UTC
The linecard from the slot 8 and 9 have been upgraded. We continue

Date: 2017-12-06 02:36:31 UTC
The linecard from the slot 10 has been upgraded. We continue

Date: 2017-12-06 02:25:33 UTC
The EPLD on the supervisors have been upgraded. We will upgrade now the linecards

Date: 2017-12-06 02:01:04 UTC
The Nexus has been upgraded. We are now upgrading the EPLD of it

Date: 2017-12-06 01:53:25 UTC
The ASR router is up to date. We are verifying if there is no issue during the upgrade.

Date: 2017-12-06 01:46:41 UTC
Both equipment are isolated. We are upgrading them

Date: 2017-12-06 01:14:23 UTC
We are going to start the maintenance
Posted Nov 22, 2017 - 03:14 UTC